Spokane Valley loses 124 jobs as Volex picks another state over Washington
Volex is closing its Servatron plant in Spokane Valley by end of next year, cutting 124 jobs and consolidating PCB work to California.
Volex will shut its Servatron facility on Mirabeau Parkway in Spokane Valley by the end of next year, ending 124 jobs and consolidating U.S. PCB assembly work at its Irvine, California plant. (Photo by Annabelle Chih/Getty Images)
(Photo by Annabelle Chih/Getty Images)
A 26-year-old Spokane Valley electronics manufacturer founded by one of the region’s signature tech employers is closing on December 31, 2026, and 124 workers are losing their jobs, while the equipment and the customers head out of state.
Servatron Inc., which assembles printed circuit boards, cable harnesses, and complete electronic sub-assemblies for industrial customers out of a 70,000-square-foot plant at 12825 E. Mirabeau Parkway, filed a federal WARN Act notice with Washington State listing 124 affected workers and an effective closure date of December 31, 2026.
Servatron’s UK-based parent, Volex PLC, confirmed the closure in a statement first reported by KHQ: “Volex Integrated Manufacturing Services will close its Spokane, Washington facility on December 31, 2026, consolidating operations into its Irvine, California site.” Volex told KHQ that “early notice has been given to both customers and employees to support a smooth transition.”
The Spokane Valley plant’s equipment and customer relationships will be transferred to a separate Volex subsidiary, Irvine Electronics Inc., in Irvine, California, according to the Spokane Journal of Business.
Two U.S. plants, one survivor — and Spokane isn’t it
The Spokane Journal of Business reported that Volex’s acting Servatron general manager Richard Brown, who also serves as the general manager of Irvine Electronics, said the decision was made at the beginning of the year “due to excess capacity at both manufacturing sites.” Brown told the Journal that Servatron’s lease on the Mirabeau Parkway facility is also set to end next year.
In other words: Volex owns two American PCB assembly plants. It doesn’t need two. It picked one to keep. The one in California won. The one in Spokane Valley lost.
Volex framed the consolidation by saying the move would “optimize its U.S. manufacturing footprint while maintaining continuity of service for customers.” What that means for the 124 workers walking out the doors at the end of next year is less optimized.
A bigger hit than the headcount suggests
The raw number of 124 jobs undersells the impact on Spokane’s industrial base.
Mike McBride, the regional labor economist for the Washington State Employment Security Department’s northeast and north central regions, told the Spokane Journal of Business that there are only about 245 jobs total in Spokane County’s specialized semiconductor and electronic component manufacturing sector.
“Losing 100 jobs in that sector is quite substantial in that niche category,” McBride told the Journal — and the WARN filing puts the actual number higher than that.
By the state’s own count, Spokane County is about to lose roughly half of its specialized electronics manufacturing workforce in a single closure. The displaced workers — assemblers, technicians, quality inspectors, production planners — won’t find a soft landing in a Spokane economy with limited demand for those exact skills.
What Volex hasn’t said
Volex has been careful to connect its public explanation to two clean, defensible reasons: excess capacity and an expiring lease. Both are real, but neither is the whole story.
What the company hasn’t said is why, given a choice between Spokane Valley and Irvine, the Spokane Valley plant was the one that had to go. Labor costs, regulatory environment, customer geography, and state tax structure are all live variables when a UK parent decides which of its two American plants to shut down. Volex isn’t saying which mattered most.
What’s not in dispute: 124 people in Spokane Valley are about to lose their jobs, a quarter-century-old Inland Northwest manufacturer founded by Itron is being erased from the local map, and the customers and the machines are heading to Southern California. The plant shuts down December 31, 2026.
Listen to The Jason Rantz Show on weekday afternoons from 3 p.m. – 7 p.m. on Seattle Red on 770 AM (HD Radio 97.3 FM HD-Channel 3). Subscribe to the podcast here. Follow Jason Rantz on X, Instagram, YouTube, and Facebook.






Comments
0 Comments